Canal del Dique

Colombia

View project
5,627 kWpPeak power
11,420 MWhAnnual production
13Hectares
12.330Modules

The "Canal del Dique" solar plant, located in the city of Arjona, Bolívar (Colombia), is Enerland's first completed plant in the country. It features an installation of 12,330 450 Wp Longi modules with a 2V Gonvarri tracker structure and generates the equivalent of the energy required to supply more than 8,422 Colombian households.