Curbe

Spain

Peak Power

Energy generated

Of CO2 emissions avoided

Supplied

In 2018, Enerland undertook the comprehensive construction of this photovoltaic facility in the EPC service mode. This small solar plant located in the town of Curbe (Huesca, Aragon) illustrates the fact that we at Enerland undertake projects of any size provided the preliminary study shows that our clients will be able to obtain the maximum profitability from them. The Curbe energy project consists of photovoltaic panels installed in a fixed structure and produces 667 MWh of energy per year without any surplus used in the form of self-consumption or energy self-sufficiency.

Curbe

Most noteworthy projects