{"id":16743,"date":"2023-07-18T11:59:56","date_gmt":"2023-07-18T09:59:56","guid":{"rendered":"https:\/\/www.enerlandgroup.com\/pfv-construction-starts\/"},"modified":"2023-07-18T13:33:50","modified_gmt":"2023-07-18T11:33:50","slug":"pfv-construction-starts","status":"publish","type":"post","link":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/","title":{"rendered":"PFV Soure construction starts"},"content":{"rendered":"<h1>22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.<\/h1>\n<p>&nbsp;<\/p>\n<p>This is our announcement for the start of construction of PFV Soure in Portugal. Back in 2019, this project was conferred to us through an auction. During this whole time, our team in Enerland Portugal has been working on <a href=\"https:\/\/www.enerlandgroup.com\/en\/development\/\">every stage for the integral development of the project<\/a>. It was in 2022 when PFV Soure achieved the status &#8220;RTB&#8221; and then, a few months later, the earthworks began. After that, the structure driving also started. The photovoltaic park Soure will have a 22 MW output. The estimation is that the setting up will be completed by the end of 2023, when it will start producing 35.150 MWh\/year. This renewable power generation will be destined to the main grid, and will prevent athmospheric emissions equivalent to 12.865 tons of CO2 per year.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-15424 size-full\" src=\"http:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Soure_Portugal.gif\" alt=\"construcci\u00f3n de PFV Soure\" width=\"768\" height=\"432\" \/><\/p>\n<h3><\/h3>\n<h3><\/h3>\n<h3>Enerland Portugal<\/h3>\n<p>&nbsp;<\/p>\n<p>Last year, by the end of June, PV capacity accumulated in Portugal rose to 2,19 GW. Nowadays, photovoltaic is the technology with the biggest growth in terms of installed capacity, rising from 299 MW in 2013 to 2192 MW in 2022, up 633%. According to data from <a href=\"https:\/\/www.apren.pt\/en\/\">APREN (Portuguese Renewable Energy\u00a0 Association)<\/a>, solar power generation got to its highest point in July, corresponding to a 9% of the total electric power suply in Portugal. Moreover, the country also broke its previous records in both June and May, when solar power represented 8,6% and 8,2% of the total generation, respectively. Enerland Group started its production in Portugal in 2019. It was then when the Spanish multinational opened its first office in the capital of this country. Ever since then, the team has grown exponentially. In parallel to PFV Soure, this team works on the development of another 13,5 MWp, as well as in various constructions simultaneously, placed in the centre and south of the country.<\/p>\n<p>&nbsp;<\/p>\n<p>This content is protected by copyright and it must not be reused. If you are interested in publishing it or getting more information, please contact: <span class=\"ui-provider vy b c d e f g h i j k l m n o p q r s t u v w x y z ab ac ae af ag ah ai aj ak\" dir=\"ltr\"><a class=\"fui-Link ___1qmgydl f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1hu3pq6 f11qmguv f19f4twv f1tyq0we f1g0x7ka fhxju0i f1qch9an f1cnd47f fqv5qza f1vmzxwi f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh ftqa4ok f2hkw1w fhgqx19 f1olyrje f1p93eir f1h8hb77 f1x7u7e9 f10aw75t fsle3fq\" title=\"mailto:marketing@enerlandgroup.com\" href=\"mailto:marketing@enerlandgroup.com\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"V\u00ednculo marketing@enerlandgroup.com\">marketing@enerlandgroup.com<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation<\/p>\n","protected":false},"author":4,"featured_media":15646,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[23,161],"tags":[],"class_list":["post-16743","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporativo","category-noticias"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PFV Soure construction starts - Enerland Energ\u00eda Renovable<\/title>\n<meta name=\"description\" content=\"22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PFV Soure construction starts - Enerland Energ\u00eda Renovable\" \/>\n<meta property=\"og:description\" content=\"22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/\" \/>\n<meta property=\"og:site_name\" content=\"Enerland Energ\u00eda Renovable\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-18T09:59:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-18T11:33:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1870\" \/>\n\t<meta property=\"og:image:height\" content=\"700\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Pilar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/\"},\"author\":{\"name\":\"Pilar\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#\\\/schema\\\/person\\\/d842c1aed4fef077270deb261453486c\"},\"headline\":\"PFV Soure construction starts\",\"datePublished\":\"2023-07-18T09:59:56+00:00\",\"dateModified\":\"2023-07-18T11:33:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/\"},\"wordCount\":332,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.enerlandgroup.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Noticia-Soure-Inicio.jpg\",\"articleSection\":[\"Corporativo\",\"Noticias\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"ItemPage\"],\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/\",\"url\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/\",\"name\":\"PFV Soure construction starts - Enerland Energ\u00eda Renovable\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.enerlandgroup.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Noticia-Soure-Inicio.jpg\",\"datePublished\":\"2023-07-18T09:59:56+00:00\",\"dateModified\":\"2023-07-18T11:33:50+00:00\",\"description\":\"22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.enerlandgroup.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Noticia-Soure-Inicio.jpg\",\"contentUrl\":\"https:\\\/\\\/www.enerlandgroup.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Noticia-Soure-Inicio.jpg\",\"width\":1870,\"height\":700,\"caption\":\"PFV Soure Construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/pfv-construction-starts\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/inicio\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PFV Soure construction starts\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/\",\"name\":\"Enerland Energ\u00eda Renovable\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#organization\",\"name\":\"Enerland Group\",\"url\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.enerlandgroup.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/Logo_Enerland.png\",\"contentUrl\":\"https:\\\/\\\/www.enerlandgroup.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/Logo_Enerland.png\",\"width\":184,\"height\":43,\"caption\":\"Enerland Group\"},\"image\":{\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/enerland-group\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCjdInbThgaPa2_D34vRChmA\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.enerlandgroup.com\\\/es\\\/#\\\/schema\\\/person\\\/d842c1aed4fef077270deb261453486c\",\"name\":\"Pilar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3e6e1323210dee16f137d8ab0ce7231001529459c2f5b2e4ec20c72d1fd442dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3e6e1323210dee16f137d8ab0ce7231001529459c2f5b2e4ec20c72d1fd442dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3e6e1323210dee16f137d8ab0ce7231001529459c2f5b2e4ec20c72d1fd442dc?s=96&d=mm&r=g\",\"caption\":\"Pilar\"},\"url\":\"https:\\\/\\\/www.enerlandgroup.com\\\/en\\\/author\\\/enerland\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PFV Soure construction starts - Enerland Energ\u00eda Renovable","description":"22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/","og_locale":"en_US","og_type":"article","og_title":"PFV Soure construction starts - Enerland Energ\u00eda Renovable","og_description":"22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.","og_url":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/","og_site_name":"Enerland Energ\u00eda Renovable","article_published_time":"2023-07-18T09:59:56+00:00","article_modified_time":"2023-07-18T11:33:50+00:00","og_image":[{"width":1870,"height":700,"url":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg","type":"image\/jpeg"}],"author":"Pilar","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#article","isPartOf":{"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/"},"author":{"name":"Pilar","@id":"https:\/\/www.enerlandgroup.com\/es\/#\/schema\/person\/d842c1aed4fef077270deb261453486c"},"headline":"PFV Soure construction starts","datePublished":"2023-07-18T09:59:56+00:00","dateModified":"2023-07-18T11:33:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/"},"wordCount":332,"commentCount":0,"publisher":{"@id":"https:\/\/www.enerlandgroup.com\/es\/#organization"},"image":{"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#primaryimage"},"thumbnailUrl":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg","articleSection":["Corporativo","Noticias"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#respond"]}]},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/","url":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/","name":"PFV Soure construction starts - Enerland Energ\u00eda Renovable","isPartOf":{"@id":"https:\/\/www.enerlandgroup.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#primaryimage"},"image":{"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#primaryimage"},"thumbnailUrl":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg","datePublished":"2023-07-18T09:59:56+00:00","dateModified":"2023-07-18T11:33:50+00:00","description":"22 MW PFV Soure construction starts. This new photovoltaic park is\u00a0 our first operation in Portugal.","breadcrumb":{"@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#primaryimage","url":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg","contentUrl":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg","width":1870,"height":700,"caption":"PFV Soure Construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.enerlandgroup.com\/en\/pfv-construction-starts\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/www.enerlandgroup.com\/en\/inicio\/"},{"@type":"ListItem","position":2,"name":"PFV Soure construction starts"}]},{"@type":"WebSite","@id":"https:\/\/www.enerlandgroup.com\/es\/#website","url":"https:\/\/www.enerlandgroup.com\/es\/","name":"Enerland Energ\u00eda Renovable","description":"","publisher":{"@id":"https:\/\/www.enerlandgroup.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.enerlandgroup.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.enerlandgroup.com\/es\/#organization","name":"Enerland Group","url":"https:\/\/www.enerlandgroup.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.enerlandgroup.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2021\/05\/Logo_Enerland.png","contentUrl":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2021\/05\/Logo_Enerland.png","width":184,"height":43,"caption":"Enerland Group"},"image":{"@id":"https:\/\/www.enerlandgroup.com\/es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/enerland-group\/","https:\/\/www.youtube.com\/channel\/UCjdInbThgaPa2_D34vRChmA"]},{"@type":"Person","@id":"https:\/\/www.enerlandgroup.com\/es\/#\/schema\/person\/d842c1aed4fef077270deb261453486c","name":"Pilar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3e6e1323210dee16f137d8ab0ce7231001529459c2f5b2e4ec20c72d1fd442dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3e6e1323210dee16f137d8ab0ce7231001529459c2f5b2e4ec20c72d1fd442dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3e6e1323210dee16f137d8ab0ce7231001529459c2f5b2e4ec20c72d1fd442dc?s=96&d=mm&r=g","caption":"Pilar"},"url":"https:\/\/www.enerlandgroup.com\/en\/author\/enerland\/"}]}},"jetpack_featured_media_url":"https:\/\/www.enerlandgroup.com\/wp-content\/uploads\/2023\/03\/Noticia-Soure-Inicio.jpg","_links":{"self":[{"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/posts\/16743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/comments?post=16743"}],"version-history":[{"count":7,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/posts\/16743\/revisions"}],"predecessor-version":[{"id":16754,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/posts\/16743\/revisions\/16754"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/media\/15646"}],"wp:attachment":[{"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/media?parent=16743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/categories?post=16743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerlandgroup.com\/en\/wp-json\/wp\/v2\/tags?post=16743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}