Virgin Olive Oil Cooperative
Spain
Peak Power

Energy generated

Of CO2 emissions avoided

Supplied

In 2019, Enerland began the construction of the “Virgin Olive Oil” Cooperative photovoltaic plant located in the town of Ejea de los Caballeros, in the province of Zaragoza, Aragon. Covering an area of 2 hectares, this project generates an average of over 1,500 MWh of solar energy a year for use in the energy self-consumption mode, which would be equivalent to supplying more than 500 Spanish homes.

Virgin Olive Oil Cooperative

Most noteworthy projects